Assembled the posts and cross beams

2 lift jacks to raise the car off the lift to work on brakes, wheels, ect.

Moved the cross beams up to first lock postion

Flipping the ramps over

Raising the ramps to attach to the cross beams

Checking alignment of bolt holes

Running the cables

cables complete

Attaching wheels to position the lift

Just some extra photos